EjecuciónDevelopment of Radiation Hard Application Specific Integrated Circuits (ASICs)
Ejecución

Development of Radiation Hard Application Specific Integrated Circuits (ASICs)

The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy') · Arr. Turnhout, Extranjero (Belgica)

48 meses
Duración
MAGICS Technologies NV
Adjudicatario

Objeto del contrato

Descripción
The subject matter of the contract is the supply of electronic components for remote handling equipment developers as well as the provision of design and development activities. The subject matter of the Contract is divided into two sub projects: 1. development of radhard multiplexing systems, 2. development of radhard camera electronics. Both projects address the design upgrade, manufacturing, testing, qualification and prototype validation of radhard Application Specific Integrated Circuits (ASICs). The manufacturing batches of radhard electronics shall cover the needs for the F4E remote handling equipment.
Sector
Energía
Tipo
Suministros · Abierto
CPV
31710000Equipo electrónico
73300000Diseño y ejecución en materia de investigación y desarrollo
Ejecución
Arr. Turnhout, Extranjero (Belgica) · 48 meses
Tramitación
Evaluación
Requerimiento pendiente
Ejecución
Cumplimiento19 nov 2021

Inteligencia competitiva

Profesional

Análisis detallado de licitaciones públicas

Accede al perfil de compra, panorama competitivo y métricas detalladas de miles de organismos y contratistas públicos en toda España.

Perfil de compraPanorama competitivoAlertas y seguimiento

Sin tarjeta de crédito · Sin compromiso

Órgano de contratación

Lotes y adjudicaciones

1

Resultado de la adjudicación

MAGICS Technologies NV🇧🇪BE

6.372.209,87 €

Contrato (con IVA)

Form. 19 nov 2021

1 oferta

Modificaciones del contrato

1

1 modificación posterior a la adjudicación

Modificación 1

The contract is hereby amended as follows: - The estimated duration of the contract has been increased to 48 months. - The value of the contract has been increased to 6,372,209.87 EUR. - The following technical changes have been introduced: Introduction of the part2 of the SER development; Introduction of the part2 of the Bidirectional Serial Synchronous Controller Module (BiSS BCM) development; Additional Multi-Project Wafer (MPW) manufacturing cycle with improvements on Application Specific Integrated Circuits (ASICs) 1,2,5 and a BiSS Slave Module (BSM) level derisking test activity to confirm correct BSM behavior in an earlier stage. The MPW also includes the SER chip; Introduction of manufacturing of BSM material for Divertor Test Platform (DTP2); Testing the camera demo for radiation

Fuente: TED · Datos tratados por Licto